Pré-lançamento / Praia Brava / Florianópolis
On one of Florianópolis' most secluded beaches, D/Pulse Beach Concept offers units from 2 to 4 bedrooms, from 86 m² to 389 m² in the penthouses.
A development designed for those seeking complete immersion in the beach lifestyle, with architecture signed by Architects Office and a leisure infrastructure that includes a 50m lap pool, spa, wellness and beach services. Estimated delivery July 2030.
LANÇAMENTO / Praia Brava / Florianópolis


On one of Florianópolis most secluded beaches, D/Verse Beach Concept brings together 2 and 3-suite apartments, from 102 m² to 215 m², just steps from the sea.
A development designed for those who seek privacy, timeless design and a living experience that goes far beyond the expected. Estimated delivery June 2027.
LANÇAMENTO / João Paulo / Florianópolis


In the João Paulo neighborhood, home to one of the most breathtaking sunsets in Florianópolis, D/Season Residence Club offers 2, 3 and 4-suite apartments, from 188 m² to 432 m² in the duplex penthouses.
A high-end development that combines the serenity of a tree-lined neighborhood with the convenience of the city's main services and thoroughfares. Estimated delivery November 2029.
LANÇAMENTO / Centro / Florianópolis


In downtown Florianópolis, beside Parque da Luz and overlooking the iconic Ponte Hercílio Luz, D/Sense Home Design brings together 3 and 4-suite apartments, from 175 m² to 215 m², spread across two towers.
With architecture and interiors signed by Greg Bousquet of ARCHITECTS OFFICE, and landscaping by Ricardo Cardim, the project integrates nature and urban life with an infrastructure level that goes far beyond the expected. Estimated delivery November 2027.
LANÇAMENTO / Beira Mar / São José


On the waterfront of São José, D/Vert Residence Club combines biophilic architecture and a full leisure club at an address just steps from the sea.
With 2 and 3-suite apartments, from 80 m² to 160 m², featuring natural light and ventilation integrated into the design and everything a family needs to live well. Estimated delivery August 2026.